7.30.2019
Gorge Farm Project: the first biogas plant in Africa to be connected to the grid
Associations
Gorge Farm is the location of one of the largest biogas plants in East Africa. The farm, which covers more than 800 hectares, feeds the plant with agricultural waste, straw and organic matter. The plant’s power output is 2.4 MW, with the electricity produced being fed into the grid or reused on the farm itself. Walter Danner, who was involved in building the project, tells us more.
Original language: English
Origin: Germany
Speaker
Walter Danner
CEO, Snowleopard projects
Next videos
04:10
4.15.2024
Green Metals Brescia: biomethane for a winning synergy, between industry and agriculture
Amedeo Rosatelli
02:09
3.27.2024
Biogas Italy 2024: Biogas and biomethane for carbon-negative agriculture
CIB (Consorzio Italiano Biogas)
01:10
2.14.2024
See you at Biogas Italy!
Christian Curlisi
01:24
1.17.2024
CiBiogás supports investments in biogas and biomethane projects in Brazil on a technical level
Rafael González